[1]
“Performance Evaluation Study of Cost and Time Benchmarks on Construction Projects Using the Earned Value Management Method.   ‘Road Duplication Paving Project in Zliten, Libya-Case study’”, JMSET, vol. 11, no. 1, pp. E 1–13, Mar. 2026, doi: 10.59743/.