[1]
Sofia, M.M. et al. 2025. Performance Evaluation Study of Cost and Time Benchmarks on Construction Projects Using the Earned Value Management Method: Road Duplication Paving Project in Zliten, Libya- Case study. Journal of Marine Sciences and Environmental Technologies. 11, 2 (Dec. 2025), E 33–46. DOI:https://doi.org/10.59743/jmset.v11i2.199.